eurovent-logo
linkedin-header twitter-header facebook-header instagram-header
  • About us
  • contact us
  • English Français Español Italiano Русский Deutsch عربى Türkçe 简体中文
eurovent-logo
  • Certification
  • Air quality and ventilation
  • Thermal comfort
  • Heat pump
  • Refrigeration
  • Regulation
  • Energy efficiency
  • News
  • Find your certified products
  • About us
  • contact us
  • English Français Español Italiano Русский Deutsch عربى Türkçe 简体中文
Editorial search only

products

No result

Articles

No result

News

No result

Events

No result

Technical insights

No result

How to apply

Certification programmes

Institutions

Certification marks

Certification process

ProdBIM

Energy efficiency label

Laboratories and agencies

Certified product directory

  1. Home
  2. News
  3. London’s Olympic landmark gets chiller upgrade

News

London’s Olympic landmark gets chiller upgrade


Nov 19, 2024
facebook twitter linkedin
Please fill out the form to get the file





Certified manufacturer, Carrier Commercial HVAC, recently completed a chiller replacement project at one of London’s most extraordinary landmarks, the ArcelorMittal Orbit in the Queen Elizabeth Olympic Park, Stratford. 

Designed by sculptor Sir Anish Kapoor and engineer Cecil Balmond, the ArcelorMittal Orbit is one of the most striking and enduring visual legacies of the London 2012 Olympic and Paralympic Games. It is the UK’s tallest sculpture and at the summit, offers a 360-degree view of London.

The product

The project involved replacing an inefficient chiller that had come to the end of its life. A Eurovent certified Carrier AquaSnap® 30RB 160R air-cooled liquid chiller, with scroll compressor, plus an added De-Superheater heat recovery option was the chosen replacement. The 30RB chiller also has refrigerant leak detector, compressor soft starter, super enviro-shield anti-corrosion protection, and water exchanger frost protection.

The project

Carrier was commissioned by ParkServe, on behalf of London Legacy Development Corporation (LLDC), to undertake the project, and enlisted the support of local contractor L&B Technical Services Ltd to complete the challenging installation. Given the height and location of the ArcelorMittal Orbit's roof plant area, at the top of the 114-metre-tall structure, securing a crane permit was costly and complicated. However, the only access to the roof plant room was through a 1m x 1m hatch.

ArcelorMittal Orbit
© Eurovent

To overcome this challenge, Carrier’s service technicians recommended and performed a strip down and rebuild of the 30RB unit. The chiller was dismantled off-site, packed into a ‘kit-of-parts’, and then transported to the roof plant area through the narrow access hatch. The unit was then meticulously reassembled on-site, eliminating the need for a crane and significantly reducing the overall cost. This method was not only cost-effective but also ensured that the chiller was installed without compromising the warranty, maintaining Carrier's high standards of service.

"This was a great project to work on. Squeezing a chiller through a 1m x 1m hatch isn’t something we do all that often," said Rob Moffat Contracts Manager, L&B Technical Services Ltd. "The crane option was quoted for but, the cost for a Carrier strip and rebuild service was a fraction of the price. We are proud of our partnership with Carrier and this project exemplifies our abilities to deliver complex and innovative HVAC solutions even under challenging circumstances."

"The project presented several logistical challenges, particularly with the limited access to the roof plant area, but Carrier's innovative strip down and rebuild was the best approach," said Hannah Barclay, Head of Contract Management, London Legacy Development Corporation. "This new modern chiller not only helps meet the current climate control needs inside the ArcelorMittal Orbit but the addition of a heat recovery De-Superheater provides a sustainable solution for years to come."

This project at the ArcelorMittal Orbit exemplifies Carrier’s ability to deliver complex and innovative HVAC solutions even under challenging conditions. The combination of a high-quality product, a tailored approach to overcoming logistical challenges, and the strong partnerships with trusted contractors like L&B ensured the success of the project.

Thank you so much for subscribing to our newsletter! We're thrilled to have you as one of our subscribers !
classic-newsletter-notification-error
Stay aware of all our updates by subscribing to our newsletter.
 
Stay aware of all our updates by subscribing to our newsletter.

Proven performance

Being able to trust performance, reliability and energy efficiency is an important step in specifying products for projects such as the ArcelorMittal Orbit.

For the HVAC and Refrigeration professional the added value of choosing a Eurovent certified product includes: 

  • Assurance that HVAC and Refrigeration systems will perform as expected. 
  • Free access to transparent, reliable and universally understood performance data, to search and compare products.  
  • The assurance that product data is accurate and has been independently tested by an expert, third-party. 

Search for Carrier certified chillers

icon-footer-brand-1
icon-footer-brand-2
icon-footer-brand-3
Find out more
logo-footer
NAVIGATION
Air quality and ventilation Thermal comfort Heat pump Refrigeration
Regulation Financial incentives Energy efficiency
News Events
SITEMAP FAQ LEGAL INFORMATION TRADEMARKS INCIDENT LIST ABOUT US CERTIFICATE CHECKER
All rights reserved@ Eurovent Certita Certification linkedin-header twitter-header facebook-header instagram-header